Implementation Actions and Progress

Interactive Implementation Actions Table

Implementation Actions are developed by the Long Island Sound Study work groups to carry out the strategies, objectives, and outcomes of the Long Island Sound Comprehensive Conservation and Management Plan (CCMP). These actions help the Long Island Sound Study decide what projects and investments are needed. The interactive table below shows each Implementation Action under the 2020-2024 CCMP Update by CCMP theme. For more information on the federal funds spent on these actions, please see our annual work plans or visit Partnership Projects. The table reports on the implementation actions’ progress, allocated federal funding, and relationship to the 20 Ecosystem Targets.

How to Use the Table

Click on the “Filter Data Table” search button below to view implementations actions connected to a specific CCMP theme or Ecosystem Target. By having this filtering option, you can better connect actions to environmental outcomes.

Interactive Implementation Actions Table Field Descriptions
  • Implementation Action Number – The associated defining number of each implementation action number. It is the Comprehensive Conservation and Management Plan theme (WW, HW, SC, SM) followed by the action number.
  • CCMP Theme – The implementation action’s associated theme of the Comprehensive Conservation and Management Plan.
  • Implementation Action Text – The text of the specific, tactical actions to measurably carry out the strategies over the next five years.
  • Implementation Action Type – The type of implementation action (discrete, ongoing).
  • Implementation Action Status – The status of the implementation action (no progress, partial progress, significant progress).
  • Total Estimated Costs – The estimated cost of each implementation action meet completion/significant progress.
  • Federal Dollars Spent – The current total of federal (EPA) dollars spent on each implementation action.
  • Ecosystem Target – The associated ecosystem target of each implementation action.
  • Implementation Action Output – The outputs of each implementation action. Comprehensive Conservation and Management Plan Strategy – The associated Comprehensive Conservation and Management Plan Strategy, broad, strategic actions needed to achieve an objective, of each implementation action.
Background on the CCMP Themes

The Long Island Sound Study (LISS), established in 1985 under Section 320 and 119 of the Clean Water Act, is one of the inaugural EPA National Estuary Programs. EPA, joined with Connecticut and New York, established the LISS Management Conference – a partnership of federal and state agencies, user groups, concerned organizations, and individuals dedicated to improving the health of the Sound. First developed in 1994, the LISS issued a revised Comprehensive Conservation and Management Plan in 2015. The plan is organized around four major themes: 1) Clean Waters and Healthy Watersheds (WW); 2) Thriving Habitats and Abundant Wildlife (HW); 3) Sustainable and Resilient Communities (SC); and 4) Sound Science and Inclusive Management (SM). Under each theme, there are set implementation actions which have been formulated to carry out each themes’ strategies to help meet the CCMP’s objectives and outcomes. Every 5 years, the LISS updates each themes’ implementation actions to successfully progress management targets relative to current successes, challenges, and gaps. In 2020, the LISS updated the CCMP Action Plan listing 136 implementation actions covering the period 2020-2024.

Implementation Action NumberImplementation Action TextImplementation Action StatusFederal Dollars SpentEcosystem TargetDetails
WW-2 Continue to collaborate with municipalities, local partners and stakeholders to strategically plan for and implement capital improvements, Best Management Practices (BMPs), and improved operation and maintenance to mitigate point and nonpoint source pollution loadings, incorporating the analysis of potential future changes in loading (WW1). Significant Progress 14,460,600.47 Extent of Hypoxia, Nitrogen Loading, Water Clarity, Impervious Cover, Approved Shellfish Areas, Sediment Quality Improvement
WW-6 By 2024, develop a plan to meet the Ecosystem Target of having all practices and measures installed to attain the 2000 Dissolved Oxygen TMDL nitrogen allocations for stormwater and nonpoint source inputs for the entire watershed. No Progress 26,600.00 Extent of Hypoxia; Nitrogen Loading; Water Clarity; Impervious Cover
WW-7 Enhance implementation of the 2000 Dissolved Oxygen TMDL, particularly for nonpoint sources. Partial Progress 2,820,404.89 Extent of Hypoxia; Nitrogen Loading; Water Clarity; Impervious Cover
WW-8 Conduct studies and research to better understand the ecosystem’s response to nitrogen reductions to support an evaluation of the 2000 Dissolved Oxygen TMDL. No Progress 8,022,018.72 Extent of Hypoxia; Nitrogen Loading; Water Clarity; Impervious Cover
WW-10 Develop a nonpoint source and stormwater tracking system tool for the Long Island Sound watershed. Partial Progress 300,000.00 Extent of Hypoxia; Nitrogen Loading; Water Clarity; Impervious Cover
WW-13 Improve efficiency and resiliency of existing/new waste treatment systems including septic, WWTF and stormwater infrastructure to be resilient to sea level rise, storm surge, and intense storms and flooding. Partial Progress 521,666.66 Extent of Hypoxia; Nitrogen Loading; Water Clarity; Impervious Cover; Approved Shellfish Areas; Sediment Quality Improvement
WW-14 Support collaborative and inclusive development of new and updated restoration/protection plans for Connecticut and New York embayment sub-watersheds with pollution load reduction targets. Significant Progress 1,887,693.82 Extent of Hypoxia; Nitrogen Loading; Water Clarity; Impervious Cover; Riparian Buffer Extent; Approved Shellfish Areas; Sediment Quality Improvement
WW-17 By 2024, develop a plan to meet the Ecosystem Target of decreasing by 10% the area of effective impervious cover in the Connecticut and New York portions of the watershed by 2035 relative to a 2010 baseline No Progress 20,985.71 Extent of Hypoxia; Nitrogen Loading; Water Clarity; Impervious Cover
WW-18 Support implementation of stormwater permit guidance requiring all new development and substantial redevelopment to capture and infiltrate runoff from the 90th percentile storm, (generally a 0.8-1.3 inch storm). Partial Progress 61,666.68 Extent of Hypoxia; Nitrogen Loading; Water Clarity; Impervious Cover; Approved Shellfish Areas
HW-8 Conduct an ecological assessment of lands and waters surrounding Long Island Sound Stewardship Sites and design green infrastructure/low-impact development pilot projects that minimize negative impacts and enhance beneficial ecosystem services of lands within or surrounding the Sites. No Progress 67,633.47 Protected Open Space; Impervious Cover
Ecosystem Target
Showing 1 to 10 of 14 entries (filtered from 136 total entries)